Title:Bridge Desk Replacement On Concrete Box-Grinders
Project Number:SPR-801
Principal Investigator:Dr. Ben Dymond, NAU
ADOT PM:Julie Mcllwain
Area:Operations
Categories:Expedited

Description:

The Arizona Department of Transportation (ADOT) bridge inventory includes a number of concrete box girder bridges, some of which have concrete decks that are approaching the end of their service life. As these bridges age, it is essential to rehabilitate or replace the concrete decks rather than demolish either the superstructure or the entire structure. ADOT has previously implemented temporary shoring, falsework, or jacking to provide stability to the box girders during deck replacement. However, this method can be very costly, inefficient, and have a large impact on maintenance of traffic during construction. The removal of the deck, which is an integral part of the load-resisting mechanism, requires an assessment of the potential for unfavorable stress redistribution; it can also cause the bridge difficulty in meeting AASHTO’s stress and deflection criteria. As a result, research is needed to develop efficient methods for replacing the deck on box-girder bridges while maintaining structural integrity without relying on inefficient and expensive temporary shoring, while also minimizing traffic disruptions.

Visit SPR-801 for further information.

Image
UA Logo with text
Image
ASU Logo with text
Image
NAU Logo with text
Image
ADOT-Logo
FHWA